On Mahoniehout in Zaandam, the start has been made with the realisation of over 600 homes in 10 individual residential buildings, De Zaanse Helden, which are connected by a double-level parking structure. The realisation will be completed by mid-2025. On the deck of the parking structure, a nature-inclusive park layout is envisioned, inspired by the remaining strip landscape. The elevated park landscape will be connected to Molenpark via a bridge over the Houtveldweg.rk.
